PROJECT MANAGEMENT

The Engineering Division manages most of the Capital Investment Program (CIP) projects for infrastructure that are currently underway in the Town of Collierville. These projects range from major road improvements down to finishing out individual developments. Below is a list of projects recently completed or underway by the Town of Collierville.

If you have a specific concern or question about a project, please feel free to contact the Engineering Department at 901.457.2340 or via email.

Recently Completed:

  • Resurfacing various streets: Metropolitan Planning Organization (MPO) Project
  • Houston Levee Railroad Crossing Improvement
  • State Route 57 Widening: Environmental Document
  • Byhalia Road and Shelby Drive Traffic Signal: Environmental Document
  • Shelby Drive and Sycamore Road Traffic Signal: Environmental Document
  • Collierville Arlington and Shelton Road: Traffic Signal Installation
  • Poplar Avenue and Progress Road: Traffic Signal Installation
  • Royal Pecan Drainage

Underway:

  • State Route 57 Widening: Design
  • Byhalia Road and Shelby Drive Traffic Signal: Design
  • Shelby Drive and Sycamore Road Traffic Signal: Design
  • Shelby Drive Widening (Sycamore Road to Highway 72): RFSOQ Design Consultant
  • Shelby Drive Annexation
  • ADA Transition Plan
  • Signal Installation at Collierville Arlington and Poplar Avenue
  • Grade Control: WC Johnson Park: Design
  • Shelby Drive Construction (Byhalia Road to East Side New High School Property Line)
  • Downtown Drainage Phase 1: Easement Acquisition

 